P4 Software
/
Ridgeline SOP Library
Rule zero: A tailings or water structure failure is a catastrophe. Inspect, record, and escalate early.
| Field | Detail |
|---|---|
| Company / site | Ridgeline Copper Operations (fictional sample company) |
| Document No. | SOP-MIN-009 |
| Revision | 1.0 (approved) |
| Effective | 2026-10-06 |
| Next review due | 2027-10-06 (or after any incident or change) |
| Applies to | Tailings and water operators, geotechnical staff, environmental staff and supervisors |
| Owner | Environmental Manager |
| Approved by | Mine Manager and Site Safety Manager |
To keep tailings storage facilities, dams, ponds, pipelines and water systems stable and compliant, and to catch early signs of failure or release.
Tailings storage facilities, process water ponds, sumps, pipelines and discharge points.
| Role | Responsibilities |
|---|---|
| Environmental Manager | Owns the inspection program and regulator reporting. |
| Geotechnical Engineer | Reviews stability data and sets action triggers. |
| Operators | Do the routine inspections and report changes. |
| Responsible person | Holds the accountability for the safety of the facility. |
| Hazard | Control |
|---|---|
| Dam wall failure or overtopping | Freeboard monitoring, pond level limits, wall inspections |
| Seepage and piping | Piezometers, seepage monitoring, early detection |
| Pipeline leaks and spills | Pressure and flow monitoring, bunding, leak detection |
| Contaminated discharge | Water quality sampling, treatment, discharge limits |
| Parameter | Value at Ridgeline Copper Mine |
|---|---|
| Tailings facility | TSF1: 42 m embankment, downstream raise, 1.5 m minimum freeboard |
| Inspections | Daily operator walk, weekly engineer inspection, annual independent review |
| Instruments | 24 piezometers, 6 inclinometers, 12 survey prisms, read weekly (every 24 hours at alert level) |
| Alert / Action | Alert at freeboard 2.0 m or a piezometer rise of 0.5 m; Action at 1.5 m or a rise of 1.0 m |
| Pond level | Maximum operating level 3,412.5 m RL |
| Pipelines | Pressure and flow monitored; automatic trip on a 10% flow drop |
| Discharge water | pH 6.5 to 8.5, sampled weekly, reported monthly to the environmental agency |
Stop the job, make the area safe and call the supervisor if any of these happen:
Controlled document. The current version lives in this library. Printed copies are uncontrolled: check the revision before you use one. Questions or improvements go to the document owner.
| Rev | Date | Author | Change |
|---|---|---|---|
| 1.0 | 2026-10-06 | Site HSE department | First issue, approved for use |
Was this page helpful?