P4 Software P4 Software / Ridgeline Policy Center

💤 HR-POL-004 Fatigue Management

Acknowledgment required. Every employee and contractor must read this policy and confirm it in the HR portal. New revisions require a new acknowledgment.

FieldDetail
CompanyRidgeline Copper Operations (fictional sample company)
Document codeHR-POL-004
Revision3.0 (approved)
Effective2026-10-01
Next review2027-10-01
OwnerOperations Superintendent
Approved byGeneral Manager and Head of People
Applies toAll employees and contractors who work shifts or drive on site

1. Purpose

To reduce the risk of injury and error caused by fatigue by setting working-time limits, rest requirements and a way for anyone to say they are too tired to work.

2. Limits

LimitRule
Hours in a shift (including overtime)Max 14 hours
Rest between shiftsAt least 10 hours
Consecutive 12-hour shiftsMax 7
Hours awake before starting a shiftMax 16
Driving home or to the airport after a night shiftNot permitted; use camp transport or rest 6 hours first
OvertimeOnly with supervisor approval and a fatigue check

3. Duties

WhoDuty
EmployeesArrive rested. Tell the supervisor if you are too tired. Never hide fatigue.
SupervisorsRun the fitness-for-work check. Stop anyone showing signs of fatigue. Do not pressure overtime.
RosteringBuild rosters inside the limits and approve swaps only if the limits hold.
HRMonitor hours worked and report breaches monthly.

4. Fatigue stand-down

Any worker can declare themselves too tired. They will be taken off safety-critical tasks and given time to rest, with no loss of pay and no disciplinary consequences.

Revision history

RevDateChange
3.02026-10-01Annual review; clarified manager duties and reporting channels
2.02025-10-01Aligned with the updated safety management system
1.02024-10-01First issue

Was this page helpful?